beautypg.com

MTS Triaxial Cell Models 656-06 User Manual

Page 42

background image

Raise the Bell

7. Turn off load unit hydraulic pressure.

Install the Specimen for Extension/Pore Pressure Tests

Before installing a specimen, lubricate dry O-rings with clean confining fluid. Clean, inspect, and lubricate
cap screws with clean confining fluid.

1.

Danger

:

The next step puts your hand in a crush zone.

Hands can be crushed and equipment can be damaged equipment when hydraulics are
turned on.

Make sure you have turned off load unit hydraulic pressure and locked the bell up in place.

Place the specimen on the platen assembly. Install both dowel pins and O-rings. Line up the cap screw
holes in the lower end cap with the holes in the platen assembly.

If you are running a pore test, position the pore pressure ports so the hardline can easily be connected.
Also slide the hardline in place, but don’t connect its fittings.

42 | Triaxial Cell Product Information

Operation

This manual is related to the following products: