Performing tests – MTS Triaxial Cell Models 656-06 User Manual
Page 37
Description
Item
Loosen the cap screws so the bell is no longer firmly attached.
2
Push the bell forward on the rails into the load frame.
3
Hand-tighten the cap screws.
4
Raise the actuator to lift the bell.
5
Attach the bell to the top mounting bracket.
6
Performing Tests
Performing a test involves five major tasks:
1. Preparing the Specimen
2. Raise and Lock the Bell
3. Install the Specimen
4. Pressurize the Triaxial Cell
5. Remove the Old Specimen
Prepare the Specimen for Pore Pressure/Extension Tests
1. Put the specimen, end caps, and jacket together in the assembly.
Assemble the Specimen
Triaxial Cell Product Information | 37
Operation
This manual is related to the following products: