beautypg.com

Performing tests – MTS Triaxial Cell Models 656-06 User Manual

Page 37

background image

Description

Item

Loosen the cap screws so the bell is no longer firmly attached.

2

Push the bell forward on the rails into the load frame.

3

Hand-tighten the cap screws.

4

Raise the actuator to lift the bell.

5

Attach the bell to the top mounting bracket.

6

Performing Tests

Performing a test involves five major tasks:

1. Preparing the Specimen
2. Raise and Lock the Bell
3. Install the Specimen
4. Pressurize the Triaxial Cell
5. Remove the Old Specimen

Prepare the Specimen for Pore Pressure/Extension Tests

1. Put the specimen, end caps, and jacket together in the assembly.

Assemble the Specimen

Triaxial Cell Product Information | 37

Operation

This manual is related to the following products: