39
Installation
This section provides guidelines for moving and installing your MTS Insight
material testing system.
Unless otherwise specified, it is your responsibility to off-load, unpack, and
move the equipment to the final location on your premises. This includes
insurance and safety responsibility.
Before moving the machine from the receiving area to its final location, be
sure to check the dimensions of all doors and passages through which the
machine will travel. Refer to the specification tables in the Introduction
section of this manual for dimensions.
Contents
Moving the 1 kN and 2 kN Frames 40
Moving the 5 kN and Higher Frames 42
Machine location and ventilation 43
The MTS Insight frames are heavy.
Moving the frame using improper procedures can injure personnel (for
example strained muscles and back injuries) or damage the frame.
When lifting the frame, take the appropriate precautions to prevent injuries to
yourself. Moving and positioning the MTS Insight frame must be performed
by qualified personnel only.
MTS Insight frames weigh from 50 kg (110 lb) to 1050 kg (2315 lb). Other
apparatus such as the pallet, packaging, and accessories add to the overall
weight. If you have any questions, call MTS.