MTS Series 311 Load Frame User Manual
Page 50
Series 311 Load Frame
50
Routine Maintenance Overview Checklist
Maintenance
E-Stop is Working if Applicable
MTS
MTS
MTS
MTS
Response to Full Stroke Waveform,
Visual and Audible
MTS
MTS
MTS
MTS
Valve Balance check displacement
control
MTS
MTS
MTS
MTS
Valve Dither Response
MTS
MTS
MTS
MTS
Grips
Cursory Check of Grips/Grip Control
MTS
MTS
MTS
MTS
Grip Supply Connections are Dry
MTS
MTS
MTS
MTS
Grip Seals are Dry
MTS
MTS
MTS
MTS
Grip Action is Acceptable
MTS
MTS
MTS
MTS
Lubricate Grip Inserts
MTS
MTS
MTS
MTS
*Symbol denotes services performed by equipment operators. Most of these procedures involve visual checks
that should not interfere with test system operation. These checks are also completed by trained field service
engineers on each Routine Maintenance visit.
†Symbol denotes service performed by trained field service engineers as part of an MTS Routine Maintenance
plan. Some of these procedures require special service tools and/or specific service training to complete.
Recommended service to be performed at each running time interval noted
Calendar Time using 8 hour Running Time
rate per day
Daily Weekly
Biweekly
Annually
Running Time-Hours
8
40
80
500
1000
1,500 2,000