3 create a project folder, 4 commissioning the field devices, Create a project folder – Lenze PROFINET Controller-based Automation User Manual
Page 22: Commissioning the field devices, Commissioning the field devices ( 22), 6commissioning of the profinet

6
Commissioning of the PROFINET
6.2
The commissioning steps in detail
22
Lenze · Controller-based Automation · PROFINET® Communication Manual · DMS 1.2 EN · 04/2014 · TD17
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
6.2.3
Create a project folder
Create a project folder on the Engineering PC.
Use this project folder to store the data generated in the following different project configuration
steps:
• Project data created in the »Engineer« or »EASY Starter«
• The project file created in the »PLC Designer«
Tip!
Create a separate project folder for every PROFINET configuration and store the project
files.
6.2.4
Commissioning the field devices
Parameterise the Lenze field devices connected to the PROFINET network by means of the
»Engineer« or »EASY Starter«.
The PROFINET Lenze Controller is exclusively configured using the »PLC Designer«.
Other Lenze field devices receive their PROFINET configuration from the higher-level control (e.g. via
the »STEP7« project of a Siemens SIMATIC S7 PLC). PROFINET settings, which might be made by
»Engineer«/»EASY Starter«, will be overwritten.
Tip!
We recommend to commission each field device individually and then integrate them into
the PLC program.
Documentation of the Lenze field devices
Detailed information about the commissioning of the Lenze field devices is provided
here.