Drawbar installation – Landoll HCDA73-1 Soil Builder Coulter Chisel User Manual
Page 13

ASSEMBLY
2-3
Drawbar Installation
• Mount the Drawbar Assembly to the lugs on the front
of the frame with 1-7/16” x 6-1/8” pins and 7/16”
kilk-pins.
• Install the brace rod to the mast with 1” x 4-1/2” pin
and 1/4” kilk pin. Attach the other end using 1” x
7-7/16” pin and two 1/4” x 2” cotter pins.
NOTE
The brace rod adjusts to locate the hitch clevis at the
correct height for the tractor drawbar and to level the
machine. Adjusting can be accomplished by turning the
brace rod by it’s handle.
• Attach the drawbar jack by slipping one tube over the
other and inserting the pin.
• Install the hose support using 5/8-11 x 2” bolt, flat
washer, lock washer and nut.
Figure 2-2: Drawbar Installation
Drawbar Jack
Hose Support
HHCS,5/8-11 x 2”
Cotter Pin,
1/4” x 2”
Pin,
1” x 7-7/16”
Drawbar
Kilk Pin,7/16”
Pin,
1-7/16” x 6-1/8”
Brace Rod
Lock Washer,5/8
Nut,5/8-11
Mast
Klik Pin,1/4”
Clevis Pin,
1” x 4-1/2”
Kilk Pin,7/16
Pin,
1-7/16” x 6-1/8”
Flat Washer,5/8”