Preparations – JULABO ME-18V Visco-Baths User Manual
Page 16
![background image](/manuals/563251/16/background.png)
Preparations
16
5. Preparations
5.1. Installation
22a
23
24
22b
24
23
Place the circulator in an upright position..
After filling, mount the viscometer.
Cover the unused opening with the lid (24).
Bath openings:
ME-31A
3
pc. 90 x 90 mm
ME-16G
2
pc. 76 x 76 mm
ME-18V
2
pc. 90 x 90 mm
A suitable control thermometer can be placed in the flow
through (23).
ME-31A, ME-18V
For the Ubbelohde viscometer with mounting stand, place the
insert (22a) in the bath opening.
By that the bath opening changes from
90 x 90 mm to dia. 51 mm.
ME-16G
For the Ubbelohde-viscosimeter with mounting stand, first fasten
the insert (22b) under the bath opening..
By that the bath opening changes from
76 x 76 mm to dia. 51 mm.
Accessories:
Order-no.
8970294
Bath cover with 4 round openings 51 mm dia.
for ME-18V
8970295
Bath cover with 5 round openings 51 mm dia.
for ME-31A