Mounting the control step 1, Step 2, Step 3 – Hydrolevel 3200-Plus User Manual
Page 3: 3remote mounting kits
MOUNTING THE CONTROL
STEP 1
Two mounting positions are available on the
back of the control (Fig. 1). Select which of the two positions
(2 knockouts) is best for the location of the control. Remove the
knockout.
STEP 2
Place control on the well. While
holding box against well nut, tighten well clamp
screw. (Fig. 2)
BACK OF FUEL SMART HYDROSTAT BOX
FIG. 1
FIG. 3
FIG. 2
NOTE: In the case of space restrictions, the Fuel Smart HydroStat
control may be mounted in a horizontal orientation without any loss
of function. Hydrolevel recommends vertical mounting, when possi-
ble, for proper orientation of LED display.
STEP 3
Insert sensor ALL THE WAY into well
through the knockout (A or B) you have chosen.
(Fig. 3)
IMPORTANT
Make sure that the immersion well or Electro-Well™ is installed in the boiler manufacturer’s designated
temperature limit control tapping.
N
NO
OT
TE
E:: If installing an Electro-Well, pipe sealing compound should be used. Teflon tape is not recommended.
3
REMOTE MOUNTING KITS
Remote Mounting Kits are available separately for mounting the
Fuel Smart HydroStat control box in a remote location. Each kit
includes mounting hardware and a remote sensor.
Part No.
Description
48-101
HydroStat Remote Mount Kit with 24" sensor
48-102
HydroStat Remote Mount Kit with 48" sensor
48-103
HydroStat Remote Mount Kit with 10' sensor
48-104
HydroStat Remote Mount Kit with 20' sensor
48-121
HydroStat Pipe Mounting Kit with 48" sensor
HydroStat 3200-Plus Instructions: HydroStat Instructions.8pg 11/14/13 3:34 PM Page 3