beautypg.com

Mounting the control step 1, Step 2, Step 3 – Hydrolevel 3200-Plus User Manual

Page 3: 3remote mounting kits

background image

MOUNTING THE CONTROL

STEP 1

Two mounting positions are available on the

back of the control (Fig. 1). Select which of the two positions

(2 knockouts) is best for the location of the control. Remove the

knockout.

STEP 2

Place control on the well. While

holding box against well nut, tighten well clamp

screw. (Fig. 2)

BACK OF FUEL SMART HYDROSTAT BOX

FIG. 1

FIG. 3

FIG. 2

NOTE: In the case of space restrictions, the Fuel Smart HydroStat

control may be mounted in a horizontal orientation without any loss

of function. Hydrolevel recommends vertical mounting, when possi-

ble, for proper orientation of LED display.

STEP 3

Insert sensor ALL THE WAY into well

through the knockout (A or B) you have chosen.

(Fig. 3)

IMPORTANT

Make sure that the immersion well or Electro-Well™ is installed in the boiler manufacturer’s designated

temperature limit control tapping.

N

NO

OT

TE

E:: If installing an Electro-Well, pipe sealing compound should be used. Teflon tape is not recommended.

3

REMOTE MOUNTING KITS

Remote Mounting Kits are available separately for mounting the

Fuel Smart HydroStat control box in a remote location. Each kit

includes mounting hardware and a remote sensor.

Part No.

Description

48-101

HydroStat Remote Mount Kit with 24" sensor

48-102

HydroStat Remote Mount Kit with 48" sensor

48-103

HydroStat Remote Mount Kit with 10' sensor

48-104

HydroStat Remote Mount Kit with 20' sensor

48-121

HydroStat Pipe Mounting Kit with 48" sensor

HydroStat 3200-Plus Instructions: HydroStat Instructions.8pg 11/14/13 3:34 PM Page 3