beautypg.com

Heidolph ROTAVAC vario control User Manual

Page 28

background image

Documents are only to be used and distributed completely and unchanged. It is strictly the users´ responsibility to check carefully

the validity of this document with respect to his product. Manual-no.: 999223 / 08/07/2009

page 28 of 34

Position housing cover.

Move housing cover slightly to make sure that the head

covers are correctly positioned.

Screw in the six socket head screws fixing the housing

cover crosswise first slightly, then tighten.

Do not tighten until head cover is in contact with housing,

max. torque 6 Nm.

Replace diaphragms and valves similarly on the other side of the pump (only

ROTAVAC vario control).

Use open ended wrench (w/f 14) to reconnect hose to el-

bow fitting.

Tighten union nut first by hand and then tighten one full

turn using open ended wrench.

If the pump does not achieve the ultimate vacuum:

- In case the diaphragms and valves have been replaced, a run-in period of several hours is required

before the pump achieves its ultimate vacuum.

- In case of unusual noise switch off pump immediately and check clamping disc positions.

If the specified ultimate vacuum is not achieved and if this does not change after the run-in period:

Check hose connectors at pump head for leaks. If necessary recheck valve seats and pump cham-

bers.

This manual is related to the following products: