Mk-5005s setup – Barranca Diamond MK-5005S Block Saw User Manual
Page 15

15
•
Before powering or starting, check for damage that could prevent this equipment from proper oper-
ation or performing its intended function. Check for binding and alignment of moving parts. Check
for damaged, broken, or missing parts.
•
Verify the ON/OFF switch is in the OFF position.
•
Before connecting the MK-5005S to a power supply, be sure the voltage, cycle and phase of the
job site power source meet the requirements of the table below.
•
If using an extension power cord, make sure the length and wire gauge corresponds to the require-
ments. An extension power cord that is too small in wire gauge (diameter), or too long in length,
will cause the motor to overheat and could cause premature failure.
•
Do not cover the motor vents as this could lead to motor overheating.
If the Diamond Blade shows signs of fatigue cracking, replace the blade before
starting work.
In order to avoid breaker tripping, a 30-amp circuit breaker should be used.
(F)
Inspect the MK-5005S for
general damage and/or loose
hardware
(D)
Inspect Wooden Strip for
excessive grooves
(E)
Verify movable Cutting Table
moves freely
(C)
Inspect the blade for damage
and verify it’s correct for the
material being cut
(A)
Ensure the ON/OFF Switch
is in the OFF position
(B)
Check all electrical connections
VOLTAGE:
230v
CYCLE:
50/60hz
PHASE:
Single phase
SETUP
Pre-start Inspection
caUTIoN
caUTIoN
NoTE:
MK-5005S
SETUP
The pre-start inspection should be performed before beginning any job.