Step 5 - Fabric Mid Installation

With one installer at top of each rafter, feed eave end of kedar into top channel opening of ridge weldment and down into
rafter. (Figure 5a) Feed both kedars at the same time and at the same rate until the ends of the kedars are at end of raf-
ter at eave. Optional method: Snap pull ropes onto pull rings at mid eaves and pull mids down from top after kedars are
started into channels simultaneously.
Raise back ends of mid kedars up until bottom of kedar can be fed down into top of channel on Upright Rear Upper
Splice. Feed both kedars down at the same time and at the same time until kedars are fully inserted into channels. (Fig-
ure 5b)
Continue this process until all mids are installed.

Figure 4d

Rafter

Ridge
Weldment

Ridge

Figure 4e

Purlin

Curved hook end

Square hook end

Purlin

Rafter

Figure 4f

Step 4 - Cont’d

Continue raising beams and attaching them until frame is completely assembled. Connect all cables and tighten. Measure to
be sure frame is square and in proper position.

Figure 5b

Ridge of adjacent bay

Upright Rear
Upper Splice

Kedar feed-
ing down into
channel

Rafter

Ridge Weldment

Figure 5a

Eave end of kedar

Front curtain
folded back onto
top of mid

~

Mid

Mid

Rafter

Pull Ring at
Mid Eave