4 rack mounting – AirLive POE-FSH2422G-390 User Manual
Page 14

2. Installation of the Switch
AirLive POE-FSH2422G-390 User’s Manual
9
The surface where you want to mount the switch must be able to sustain at least 2.5kg.
Do not place heavy objects (more than 3kg) on top of the switch.
The location must preferably be free from excessive dust, away from heat vent, hot-air
exhaust and direct sunlight.
The switch should not be placed near large electric motors or other strong
electromagnetic sources. As a reference, the strength of the electromagnetic field on
site should not exceed the (RFC) standards for IEC 801-3, Level 2(3V/M) field strength.
The air temperature in the location should be within a range of 32 to 113 °F (0 to 45°C).
The relative humidity in the location should not exceed 95% non-condensing humidity.
The distance between the RJ-45 port and the standard network interface should not
exceed 100 meters.
Adequate space should be allowed in front of all the ports, so that each port is easily
accessible for cable connections.
Leave at least 10cm(4 inch) of space around the switch to allow heating dissipation
2.4 Rack Mounting
The POE-FSH2422G-390 PoE Switch can be mounted on a standard size 19-inch rack,
which can in turn be placed in a wiring closet with other equipments.
Before you can mount the switch on the rack, first you must attach the mounting brackets
on both sides of the switch with screws, and then mount it as a unit on the rack.
To mount the unit on a rack, please follow the steps below:
Step 1 First, align the holes on the bracket with the holes on both side of the switch.
Step 2 Insert screws into the holes and then fasten the bracket on one side of the switch
with a screwdriver.
Step 3 Repeat Step 1 and 2 to fasten the bracket on the other side of the switch.
Step 4 Mount the unit on the rack and align the notches on both brackets with mounting
holes on the rack, and then secure the unit with suitable screws.