Tank removal/installation, Filter screen removal/installation, Pump removal/installation – JLG 9MP Service Manual User Manual
Page 37: Pressure adjust valve removal/installation

SECTION 4 - CONTROL COMPONENTS
3121163
– JLG Lift –
4-7
Tank Removal/Installation
Filter Screen Removal/Installation
Pump Removal/Installation
Pressure Adjust Valve Removal/Installation
Tank - Removal/Installation
• For reassembly reference, place a mark on tank and valve body.
1. Tank Assembly
3. O-Ring Seal (a)
2. Tank Screws (Qty. 4) 4. Reference Mark
Note: (a) Lubricate o-ring with clean hydraulic fluid before sliding
tank over during installation.
Filter Screen - Removal/Installation
• Requires removal of tank assembly.
1. Filter Screen
4. Tube Attach Screw
2. Pump Pick-Up Tube
5. O-Ring
3. Tube Retainer Clip
Note: Tubes shown shortened for illustrative purposes only.
2
4
1
3
2
1
2
3
4
5
Pump - Removal/Installation
• Requires removal of tank assembly and pump pick-up tube.
1. Pump Assembly
3. Motor to Pump Coupler
2. Pump Assembly Screws
4. Pump Shaft Bearing
Pressure Adjust Valve - Removal/Installation
1. Adjust Valve Cap
4. Valve Ball
2. Adjustment Screw
5. Adjust Valve Port
3. Valve Spring
Note: Adjust pressure per specification shown in Section-1 of this
Service Manual.
1
2
3
4
1
2
3
4
5