beautypg.com

4 installation, 1 preparing installation, 2 system requirements – Eppendorf G0.5 µPlate User Manual

Page 9: Installation 4.1, Preparing installation, System requirements

background image

Installation

Eppendorf

®

μPlate G0.5

English (EN)

9

4

Installation

4.1

Preparing installation

Use the details included in the delivery package to check that the delivery is complete .

Check all parts for any transport damage.

4.2

System requirements

The following items are required for a measurement with the μPlate G0.5:

• An Eppendorf PlateReader AF2200

• A computer with the PlateReader AF2200 software

Make sure that the following absorbance filters are installed in the filter slide of your
device:

• Position 1: 260 (5) nm

• Position 2: 280 (5) nm

• Position 3: 340 (10) nm

Store the transport packaging and packing material for future safe transport or
storage.

The PlateReader AF2200 and μPlate G0.5 may only be used at room temperature
under normal laboratory conditions.