Fitting procedure bull bar preparation – ARB 3415010 User Manual
Page 11
Last Rev Date:29/10/2008
Page 11 of 20
Fitting instructions# 3783250
Copyright © 2005 by ARB Corporation Limited. All rights reserved, this document must not be reproduced without the express authority of ARB Corporation Ltd
FITTING PROCEDURE BULL BAR PREPARATION
37.
Remove indicators from cartons.
Remove fitted screw and speednut
assembly. These will not be reused.
New screws and grommets are supplied
in the fitting kit.
36. With
lenses
removed, replace 21W light bulbs
for indicator (amber reflector side) in supplied
indicator/run lamp assemblies with 10W bulbs
from fitting kit.
37.
Insert nylon nuts into square holes in light
brackets inside wing area.
38.
Fit lights using screws supplied in fitting
kit, taking note of RH and LH light bodies,
they are different and must be placed on
the correct side of bull bar. Vent holes
must be down,
- RD153 (40 pages)
- RD139 (36 pages)
- RD93 (34 pages)
- RD101 (46 pages)
- RD100 (46 pages)
- RD104 (46 pages)
- RD103 (46 pages)
- RD102 (46 pages)
- RD105 (46 pages)
- RD125 (42 pages)
- RD117 (44 pages)
- RD116 (44 pages)
- RD113 (42 pages)
- RD147 (44 pages)
- RD109 (42 pages)
- RD158 (38 pages)
- RD158 (44 pages)
- RD166 (42 pages)
- RD168 (44 pages)
- RD115 (44 pages)
- RD80 (44 pages)
- RD82 (40 pages)
- RD81 (40 pages)
- RD119 (40 pages)
- RD99 (40 pages)
- RD83 (44 pages)
- RD84 (44 pages)
- RD132 (40 pages)
- RD05 (38 pages)
- RD12 (44 pages)
- RD114 (36 pages)
- RD40 (38 pages)
- RD197 (42 pages)
- RD94 (40 pages)
- RD44 (46 pages)
- RD85 (42 pages)
- RD127 (40 pages)
- RD128 (40 pages)
- RD138 (40 pages)
- RD20 (44 pages)
- RD32 (44 pages)
- RD110 (42 pages)
- RD106 (48 pages)
- RD107 (48 pages)
- RD136 (42 pages)