ARB RD158 User Manual
Rd158, Installation guide
Table of contents
Document Outline
- INSTALLATION GUIDE
- ARB 4x4 ACCESSORIES
- 1.1 Pre-Installation Preparation
- 1.2 Tool-Kit Recommendations
- 2.1 Vehicle Support
- 2.2 Differential Fluid Drain
- 2.3 Disconnecting the Axles
- 2.4 Marking the Bearing Caps
- 2.5 Checking the Current Backlash Amount
- 2.6 Removing the Differential Center
- 3.1 Measurement of Pre-Load Shimming
- 3.2 Calculation & Selection of Shims
- 4.1 Installing the Carrier Bearings
- 4.2 Mounting the Ring Gear
- 4.3 Drilling and Tapping the Bulkhead Port
- 4.4 Assembling the Differential Carrier
- 4.5 Calculation & Selection of Pre-Load Shims
- 4.6 Reinstalling the Bearing Caps
- 4.7 Checking the Backlash
- 4.8 Profiling the Seal Housing Tube
- 4.9 Setting Up the Bulkhead Fitting
- 4.10 Leak Testing the Air Locker
- 4.11 Reinstalling the Axles
- 5.1 Mounting the Solenoid
- 5.2 Running and Securing the Air Line
- 5.3 Connection to the Bulkhead Fitting
- 6.1 Mounting the Actuator Switch(es)
- 6.2 Wiring the Actuator System
- UP
- SWITCH
- SINGLE Air Locker SYSTEM
- DUAL Air Locker SYSTEM
- 7.1 Leak Testing
- 7.2 Testing the Air Locker Actuation
- 7.3 Re-Sealing & Filling the Differential
- 7.4 Post-Installation Check List
- 8.1 Exploded Assembly Diagram
- 8.2 Itemized Parts List