beautypg.com

Bunn Dual TF User Manual

Page 33

background image

Page 33

SERVICE (cont.)

SOLENOID VALVE (Inlet)

Location:

The solenoid valve is located inside the lower

right front of the brewer.

Test Procedure:
1. Disconnect the brewer from the power source and

draw 1/4 gallon of water from faucet.

2. Remove both wires from the solenoid valve coil

terminals.

3. Check the voltage across the removed wires:

a.) Violet and white on 120/208 volt and 120/240

volt three wire electro/mechanical models.

b.) Violet and red on 200 volt and 240 volt electro/

mechanical models.

c.) White/Blue and White on 120/208 volt and

120/240 volt electronic models.

d.) White/Blue and Red on 200 volt and 240 volt

electronic models.

with a voltmeter. Connect the brewer to the power
source. The indication must be:
a.) 120 volts ac for 120/208V and 120/240V three

wire models.

b.) 200 to 240 volts ac for 200V or 240V two wire

models.

4. Disconnect the brewer from the power source.

If voltage is present as described, proceed to #5.
If voltage is not present as described, refer to the
wiring diagrams and check brewer wiring harness.

5. Check for continuity across the solenoid valve coil

terminals.

If continuity is present as described, reconnect the
white and violet wires on the electro/mechanical con-
trolled 120/208 and 120/240 volt brewers, white and
white/blue on electronic controlled 120/208 and 120/
240 volt brewers, red and violet on electro/mechanical
controlled 200 or 240 volt brewers and red and white/
blue on electronic controlled 200 or 240 volt brewers.
If continuity is not present as described, replace the
solenoid valve.

6. Check the solenoid valve for coil action. Connect

the brewer to the power source. Listen carefully in
the vicinity of the solenoid valve for a "clicking"
sound after approximately 1 second, as the coil
magnet attracts.

7. Disconnect the brewer from the power source.

If the sound is heard as described and water will not
pass through the solenoid valve, there may be a
blockage in the water line before or after the solenoid
valve or, the solenoid valve may require inspection for
wear, and removal of waterborne particles.
If the sound is not heard as described, replace the
solenoid valve.

Removal and Replacement:
1. Remove all wires from the solenoid valve coil.
2. Turn-off the water supply to the brewer.
3. Disconnect the water lines to and from the sole-

noid valve.

4. Remove the two #8-32 slotted head screws hold-

ing the solenoid valve and mounting bracket to
the brewer trunk.

5. Lift-out the solenoid valve.
6. Remove the two #10-32 slotted head screws

holding the solenoid valve to the mounting bracket.

7. Securely install the new solenoid valve to its

mounting bracket.

8. Attach the solenoid valve and mounting bracket to

the brewer trunk.

9. Securely fasten the water lines to and from the

P983

(Continued)

.

MI

NU

TE

S

BU

NN

-O

-M

AT

IC

P/

N

26

20

-

12

0 V

AC

.

MI

NU

TE

S

BU

NN

-O

-M

AT

IC

P/

N

26

20

-

12

0 V

AC

2

2

2

1.5

1.5

1

1

1

.5

.5

2.5

2.5

MI

NU

TE

S

MINUTES

MI

NU

TE

S

MINUTES

MI

NU

TE

S

MINUTES

P/

N

24

48

6-0

00

0

12

0 V

AC

P/N 24486-0000

120 VAC

BU

NN

-O

-M

AT

IC

BUNN-O

-MATIC

3

3

3

4

4

5

5

6

6

7

8

2

2

2

1.5

1.5

1

1

1

.5

.5

2.5

2.5

MI

NU

TE

S

MINUTES

MI

NU

TE

S

MINUTES

MI

NU

TE

S

MINUTES

P/

N

24

48

6-0

00

0

12

0 V

AC

P/N 24486-0000 120 VAC

BU

NN

-O

-M

AT

IC

BUNN-O-MATIC

3

3

3

4

4

5

5

6

6

7

8

STA

RT

ON

/ WA

RM

ER

SE

LE

CTO

R

RE

ADY

READ

Y

ON

/ W

AR

ME

R

STAR

T

1

1⁄2

ga

l

1 gal

1⁄2

ga

l

SELE

CTO

R

1

1⁄2

gal

1 g

al

1⁄2

gal