beautypg.com

Fig. 15—wiring diagram – Bryant 352MAV User Manual

Page 11

background image

Fig. 15—Wiring Diagram

A01018

LEGEND

BHI / LOR BLOWER MOTOR SPEED CHANGE RELAY, SPDT
BHT / CLR BLOWER MOTOR SPEED CHANGE RELAY, SPDT
BLWM

BLOWER MOTOR, 4 or 5 -SPEED, PERMANENT-SPLIT-CAPACITOR

BLWR

BLOWER MOTOR RELAY, SPST (N.O.)

CAP

CAPACITOR

-1 = BLWM

-2 = IDM

CPU

MICROPROCESSOR AND CIRCUITRY

EAC-1

ELECTRONIC AIR CLEANER CONNECTION (115 VAC, 1 AMP MAX.)

EAC-2

ELECTRONIC AIR CLEANER CONNECTION (COMMON)

FRS

FLAME ROLLOUT SWITCH OVERTEMP. MANUAL RESET, SPST (N.C.)

FSE

FLAME-PROVING SENSOR ELECTRODE

FU1

FUSE, 3 AMP, AUTOMOTIVE BLADE TYPE, FACTORY INSTALLED

FU2

FUSE, FIELD INSTALLED

GV

GAS VALVE, REDUNDANT LOW-HEAT OPERATO RS, 2-STAGE

HPS

HIGH-HEAT PRESSURE SWITCH, SPST (N.O.)

HPSR

HIGH-HEAT PRESSURE SWITCH RELAY, SPST (N.C.)

HSI

HOT-SURFACE IGNITER (115 VAC)

HSIR

HOT-SURFACE IGNITOR RELAY, SPST (N.O.)

HUM

24VAC HUMIDIFIER CONNECTION (0.5 AMP. MAX.)

IDM

INDUCED DRAFT MOTOR, 2-SPEED, SHADED-POLE

IDR

INDUCER MOTOR RELAY, SPST (N.O.)

IHI / LOR

INDUCER MOTOR SPEED CHANGE RELAY, SPDT

ILK

BLOWER DOOR INTERLOCK SWITCH, SPST (N.O.)

JB

JUNCTION BOX

LED

LIGHT-EMITTING DIODE FOR STATUS CODES

LGPS

LOW GAS-PRESSURE SWITCH, SPST (N.O.)

LPS

LOW-HEAT PRESSURE SWITCH, SPST (N.O.)

LS

LIMIT SWITCH, OVERTEMPERATURE-AUTO RESET, SPST (N.C.)

MGVR

MAIN GAS VALV E RELAY, DPST (N.O.)

-

1 = VALVE

-

2 = HUMIDIFIER

PL1

12-CIRCUIT CONNECTOR

PL2

9-CIRCUIT CONNECTOR

PL3

4-CIRCUIT IDM CONNECTOR

PL6

2-CIRCUIT HSI CONNECTOR

SW1

HIGH-HEAT-ONLY SWITCH, SPST (MANUAL)

*

SW2

LOW-HEAT-ONLY SWITCH, SPST (MANUAL)

*

SW3 & 4

BLOWER-OFF DELAY SETTING SWITCHES,

SPST (MANUAL)

*

TJ

TWINNING JUMPER, SPDT FOR MASTER OR

SLAVE STATUS (MANUAL CHANGE OVER)

TRAN

TRANSFORMER-115VAC/24VAC

TWIN/TEST

1-CIRCUIT TWINNING BUSS CONNECTOR,

ALSO COMPONENT TEST

JUNCTION

TERMINAL

CONTROL TERMINAL

FACTORY POWER WIRING (115VAC)

FACTORY CONTROL WIRING (24VAC)

FIELD POWER WIRING (115VAC)

FIELD CONTROL WIRING (24VAC)

CONDUCTOR ON CONTROL

FIELD WIRING SCREW TERMINAL

FIELD GROUND

EQUIPMENT GROUND

FIELD SPLICE

PLUG RECEPTACLE

NOTES:

1. Use only copper wire between the disconnect switch and the

unit.

2. If any of the original wire, as supplied, must be replaced, use

the same or equivalent type wire.

3. Inducer (IDM) and blower (BLWM) motors contain internal

auto-reset thermal overload switches.

4. Blower motor speed selections are for average conditions. See

Installation Instructions for details on optimum speed selection.

5. Replace only with a 3-AMP fuse.
6. This wire must be connected to furnace sheet metal for

control to prove flame.

7. Factory connected when LGPS not used.

RED

LS

FRS

RE

D

RE

D

OR

N

LGPS

LPS

(W

HE

N U

S

E

D

)

SWITCH

1

2

HEAT
SET-UP
SWITCH
NORM
HI HT
LO HT

*

ON

OF

F

OFF

ON

BLOWER-

OFF DELAY
(SEC.)

SWITCH

3

4

90 SEC

135 SEC

*

180 SEC
225 SEC

ON

OFF

OF

F

ON

2-STAGE

FURNACE

CONTROL

FA

CT

OR

Y

S

E

TTI

N

G

S

1

2

34

ON

OF

F

3

2

1

BLOWER-OFF DELAY
BLOWER-OFF DELAY
LOW-HEAT ONLY
HIGH-HEAT ONLY

*

W2

Com

24V

W/W1 Y/Y2

R

G

HUM

LED

S

M

TJ

TWIN

TEST

12

11

10

PL1

32

1

9

87

FS

E

HPS

HI

M

IDM

HSI

ILK

JB

L1

PL6

1

2

1

2

3

PL2

PR1

PR2

L1

L2

COMMON

HI-COOL

HI-GAS

HEAT

EAC-2

EAC-1

LO-GAS
HEAT

SPARE

SEC1

FU1

SEC2

NOTE #4

BLWM

BRN

BRN

CAP-1

TRAN

GV

C

GRN/YEL

FUSED DISCONNECT

SWITCH (WHEN REQ'D)

NOTE #1

BLK

WHT

GRN

L2

GND

FU2

CONNECTION DIAGRAM

L1

BLWR

TO 115VAC FIELD DISCONNECT SWITCH

NOTE #1

EQUIPMENT GROUND

LO-GAS-HEAT

HI-GAS-HEAT

SPARE

NOTE #4

COMMON

HSIR

EAC-1

SCHEMATIC DIAGRAM

(NATURAL GAS & PROPANE)

EAC-2

3

1

HSI

2

9

PL2

PR2

115VAC

PR1

TRAN

24VAC

IDR

L2

ILK

BLWM

BHI / LOR

BHT / CLR

CAP-1

BRN

BRN

PL6

IHI / LOR

SEC1

FU1

NOTE #5

1

2

3

HPSR

1
5
6

2

N/A

N/A

HI-COOL

PL3

4
7

SEC2

8

LS

FRS

N/A

12

2

3

MGVR-2

9

6

NOTE #7

(WHEN USED)

TWIN
TEST

SLAVE

MASTER

W/W1

R

HUM

TWINNING
JUMPER

TJ

W2

Y/Y2

G

MGVR-1

HPS

5

4

1

10

7

8

FSE

11

HI

M

C

NOTE#6

PL1

COMPONENT TEST

CPU

LGPS

C

OM

RED

LO

RED

MED LO

BLU

COM

WHT

BLK

HI

YEL

MED HI

MED

COM

HI

MED

MED LO

LO

NOTE #14

ORN

SPARE

MED HI

SPARE

BLU

NOTE #14

RED

RED

ORN

BL

U

G

R

N

/YEL

GR

Y

BR

N

WHT

WH

T

BL

K

YEL

YEL

WH

T

GR

Y

WH

T

OR

N

WHT

BLK

WHT

BL

K

BLK

BL

K

GRN / YEL

BLU

WH

T

BRN

BRN

GRY

4

G

R

N

/YEL

NOTE #6

PL3

LO

4

COM

HI

LPS

GV

8. Symbols are an electrical representation only.
9. BLOWER-ON DELAY: Gas heating 60 seconds,

Cooling/Heat Pump 2 seconds.

10. BLOWER-OFF DELAY: Gas heating 90, 135, 180, or

225 seconds, cooling or heat pump 90 seconds.

11. IGNITION-LOCKOUT will occur after four

consecutive unsuccessful trials-for-ignition.
Control will automatically reset after three hours.

12. Control must be grounded at pin 10 of 12-pin connector.
13. NA - Not Applicable (Not used)
14. Orange lead not available on all models.

CAP-2

BRN

BRN

GRN

C

AP-

2

RE

D

To initiate the component test sequence with no thermostat inputs and with all inducer Post-Purge and Blower-Off Delay periods completed, short the "TWIN/TEST" terminal to the "

C

OM" terminal for about two seconds. The control

will turn ON the inducer motor High-Speed, HSI, inducer motor Low-Speed, blower motor Low-Gas-Heat Speed, blower motor High-Gas-Heat Speed, and blower motor High-Cool Speed for 7-15 seconds each
(the inducer motor will be ON the entire length of the test). Neither the gas valve nor the humidifier will be turned ON.

RE

D

WH

T

OL

YEL

ID

M

OL

NOTE #7

326050-101 REV. B

OR

N


11