beautypg.com

Fig.11 . system wiring diagram – Bosch 14/19CBI User Manual

Page 12

background image

12

Fig.11 . System wiring diagram

Control Board

X1

Pump L

Pump N

Permanent N
Permanent L

Switched L

(Boiler Demand)

Earth post

Cable clamp

OUTSIDE OF BOILER

INSIDE OF BOILER

System
wiring centre

Terminal strip

Boiler/pump
demand from
system wiring
centre

L switched

Pump not to be
connected to
system wiring
centre

Pump
(supplied from
boiler only)

L

N

E

Timer

R

oom thermost

at

Tank thermost

at

Sy

stem w

ater v

alv

es

230V 50Hz

(5A Fuse)

System components wired into terminal strip

in accordance with component manufacturers instructions

Fr

ost st

at

Common isolator
for wiring centre
and boiler

Should be located
adjacent to the
boiler

Mains Earth (T

OP CONNECTION)

Pump Earth

(BOTT

OM CONNECTION)

This manual is related to the following products: