START-UP CHECKLIST

(Remove and Store in Job File)

I. PRELIMINARY INFORMATION

MODEL NO.:

DATE:

SERIAL NO.:

TECHNICIAN:

II. PRE-START-UP (insert checkmark in box as each item is completed)

Ⅺ VERIFY THAT CONDENSATE CONNECTION IS INSTALLED AS SHOWN IN THE INSTALLATION

INSTRUCTIONS

Ⅺ CHECK ALL ELECTRICAL CONNECTIONS AND TERMINALS FOR TIGHTNESS

Ⅺ CHECK THAT INDOOR AIR FILTERS ARE CLEAN AND IN PLACE

Ⅺ VERIFY THAT UNIT INSTALLATION IS LEVEL WITHIN TOLERANCES LISTED IN THE INSTALLATION

INSTRUCTIONS

Ⅺ CHECK FAN WHEEL AND PROPELLER FOR LOCATION IN HOUSING/ORIFICE AND SETSCREW

TIGHTNESS

Ⅺ CHECK PULLEY ALIGNMENT AND BELT TENSION: REFER TO INSTALLATION INSTRUCTIONS

III. START-UP

ELECTRICAL

SUPPLY VOLTAGE

L1-L2

L2-L3

L3-L1

COMPRESSOR AMPS

L1

L2

L3

INDOOR FAN AMPS

L1

L2

L3

TEMPERATURES

OUTDOOR-AIR TEMPERATURE

DB

RETURN-AIR TEMPERATURE

DB

WB

COOLING SUPPLY AIR

PRESSURES

REFRIGERANT SUCTION

PSIG

REFRIGERANT DISCHARGE

PSIG

Ⅺ VERIFY REFRIGERANT CHARGE USING COOLING CHARGING CHARTS ON PAGE 31

Ⅺ VERIFY THAT 3-PHASE SCROLL COMPRESSOR IS ROTATING IN CORRECT DIRECTION (558D072 ONLY)

----------------------------------------------------------------------------------------