WIKA S-10 User Manual
Page 5
![background image](/manuals/465663/5/background.png)
1604457.14 GB/D/F/E 12/2009
8 WIKA Operating instructions/Betriebsanleitung/Mode d'emploi/Instrucciones de servicio S-10, S-11
1604457.14 GB/D/F/E 12/2009
9
WIKA Operating instructions/Betriebsanleitung/Mode d'emploi/Instrucciones de servicio S-10, S-11
Electrical connections
L-connector DIN
175301-803 A
Circular connector
M12x1
Flying leads with 1.5 m of cable
2-wire
U+ = 1 U- = 2
U+ = 1 U- = 3
U+ = brown U- = green
3-wire
U+ = 1 U- = 2 S+ = 3 U+ = 1 U- = 3 S+ = 4 U+ = brown U- = green
S+ = white
Cable screen
grey
Wire gauge
up to max. 1.5 mm2
-
0.5 mm2 (AWG 20)
Diameter of cable
6-8 mm
(ship approval:
10-14 mm)
-
6.8 mm
Ingress protection per
IEC 60 529
IP 65
IP 67
IP 67 or IP 68
The ingress protection classes specified only apply while the pressure transmitter is
connected with female connectors that provide the corresponding ingress protection.
Connect the instrument to earth via the pressure connection.
For transmitter with voltage output signal: Operate the pressure transmitter with a
shielded cable and earth the shield at least on one side of the cable, if the cable is
longer than 30 m or if it is run outside of the building.
For North America: The connection shall be made to „Class 2 Circuits“ or „Class 2
Power Units“ according to CEC (Canadian Electrical Code) or NEC (National Electrical
Code).
Ingress protection per IEC 60529 (The ingress protection classes specified only apply
while the pressure transmitter is connected with female connectors that provide the
corresponding ingress protection).
Ensure that the cable diameter you select fits to the cable gland of the connector.
Ensure that the cable gland of the mounted connector is positioned correctly and
that the sealings are available and undamaged. Tighten the threaded connection and
check the correct position of the sealings in order to ensure the ingress protection.
Please make sure that the ends of cables with flying leads do not allow any ingress of
moisture.
Electrical connection
7. Starting, operation
GB
7. Starting, operation
GB