Installation guidelines – AZEK Pavers User Manual
Page 2

Page 2
Installation Guidelines
AZEK Pavers should be installed in accordance with the local building codes and the installation guidelines
included below. AZEK Building Products, Inc. accepts no liability or responsibility for the improper installation
of this product. AZEK Pavers may not be suitable for every application and it is the sole responsibility of the
installer to be sure that AZEK Pavers are a fit for the intended use. Since all installations are unique, it is also
the installer’s responsibility to determine specific requirements for each application. AZEK Building Products
recommends that all applications be reviewed by a licensed architect, engineer or local building
official prior to installation.
Tools Required
NOTE: Some items are application specific
• Landscape Applications Only
• Hammer
• 4' Level
• Broom
• Shovel
• Metal Spikes
• Hand or Vibratory Plate Compactor
• (2) 3/4" Pieces of Conduit
Visit www.azek.com/azek-deck/installation/ to view AZEK installation videos.
• Safety Glasses, Gloves,
Ear Plugs
• Marker
• Hand Dolly
• Edging
• Caulking Gun
• Adhesive - for
recommended types,
www.azek.com/
gluingpavers
• Utility Knife
• Jigsaw or Miter Saw
• 5-6 tpi jigsaw blade
• 10" 24 tooth mitre saw
blade
• 12" 32 tooth mitre saw
blade
• www.azek.com/cutting
pavers
Installation Guidelines
STOP! Read this section before you start!
• Do not install where standing, above-ground
water conditions are anticipated. Proper
sub base grading and other storm-water
management designs should prevent the
appearance of water at grade-level. In areas
where small pooling occurs, adhesive can be
used to affix the pavers to the grids to increase
installation integrity.
• Do not install where high volume vehicle traffic
is expected (e.g. crosswalk). AZEK Pavers are
designed for low volume, low speed vehicle
traffic (e.g. driveways, parking lots).
For most current care and cleaning, technical information and more, visit www.azek.com.
• Do not install for use as a fire pit. Grills and fire
bowls may be used when placed over a fire mat
to prevent any damage from burning embers.
• Failure to install AZEK Pavers in accordance
with applicable building codes and this
Installation Guide may lead to personal injury,
affect product performance and void the
product warranty.
Please call AZEK Customer Service at
1-877-ASK-AZEK or visit our Support Center at
www.AZEK.com