beautypg.com

Allied Telesis AT-8088/xx (MT and SC) User Manual

Page 66

background image

Installation

66

As power is applied to the switch, the Fault LED (shown in Figure
33)
flashes briefly as the switch loads its operating software. This
process takes only a few seconds. After the switch has finished
loadings its software, the Fault LED will stop flashing and remain
OFF.

Figure 33 Fault LED

Note

Refer to the section

System LEDs

on page 33 for information on the

system LEDs.

The switch is ready for network operations.

If you want to manage the switch and configure its operating
parameters, go to the next procedure for instructions on how to start a
local management session.

Note

No further installation steps are required if you do not need to
change the default parameter settings of the switch, which are
listed in the AT-S39 Management Software User’s Guide.
However, if you want to manage the switch, refer to

Starting a Local

Management Session

on page 70.

100

FULL

ACT

ERROR

LINK

PORT B

FAULT

MASTER

RS-232 TERMINAL PORT

PWR

MODE

RPS

Fault LED

This manual is related to the following products: