Chapter 2, Installation – Allied Telesis AT-8550SP User Manual
Page 45

45
Chapter 2
Installation
This chapter contains the installation procedures for the switch. The
chapter contains the following sections:
Reviewing Safety Precautions on page 46
Selecting a Site for the Switch on page 47
Planning the Installation on page 48
Unpacking the Switch on page 50
Installing the Switch in a Rack on page 51
Installing an Optional Expansion or Stacking Module on page 53
Installing an Optional GBIC Module on page 56
Installing an Optional SFP Module on page 58
Cabling and Powering On the Switch on page 60
Wiring a DC Powered Unit on page 66
Starting a Local Management Session on page 69
Warranty Registration on page 71
Note
For installation instructions for the optional AT-RPS3004
Redundant Power Supply unit, refer to the AT-RPS3004 Power
Supply Unit and AT-PWR3004 Power Module Installation Guide
included with the RPS unit.