Required test equipment, Procedure, Required test equipment -33 – Agilent Technologies E4438C User Manual
Page 125: Procedure -33
![background image](/manuals/42185/125/background.png)
Adjustments
ALC Calibration
4- 33
Required Test Equipment
• Agilent E4418B E-Series power meter
• Agilent E9304A E-Series power sensor
Procedure
Figure 4-25
ALC Calibration Setup
1. Connect the equipment as shown above.
2. Preset all of the equipment.
3. Follow the instructions as they appear on the controller’s display.