beautypg.com

Ashcroft 2236 - Digital Sanitary Pressure Gauge User Manual

Page 23

background image

– 23 –

Installation Procedure for 2232 XU2:

ƽ

ESD precautions should be taken. See page 31 for details.

1. Ensure all power is off/disconnected from the circuit.

2. Connect the red wire (G) to the positive power terminal.

3. Connect the black wire (H) to the positive meter terminal.

Wiring Switch 1:

Normally Open: Use the white and brown wires.

Normally Closed: Use the green and brown wires.

Wiring Switch 2:

Normally Open: Use the yellow and orange wires.

Normally Closed: Use the blue and orange wires.