Ashcroft 2236 - Digital Sanitary Pressure Gauge User Manual
Page 23

– 23 –
Installation Procedure for 2232 XU2:
ƽ
ESD precautions should be taken. See page 31 for details.
1. Ensure all power is off/disconnected from the circuit.
2. Connect the red wire (G) to the positive power terminal.
3. Connect the black wire (H) to the positive meter terminal.
Wiring Switch 1:
Normally Open: Use the white and brown wires.
Normally Closed: Use the green and brown wires.
Wiring Switch 2:
Normally Open: Use the yellow and orange wires.
Normally Closed: Use the blue and orange wires.
This manual is related to the following products: