beautypg.com

Load material, 8 load material, You will need – Wagner ProCoat User Manual

Page 8

background image

English

8

2. Load

Material

You will need:

• The material you plan to spray

• Extension cord

• Waste bucket

1. Push the red inlet release

button to ensure proper inlet

valve operation.

4. Hold return tube over waste

bucket until material is flowing

(approximately five seconds).

5. Turn power OFF.

2. Unclip the suction hose and return tube.

Place suction hose into material container (a).

Place return tube into a waste bucket (b).

6. Place return tube into material container

and clip tube and suction hose together.

3. Plug in the sprayer. Turn the

PRIME/SPRAY knob to PRIME.

Turn the power ON.

1

3

2

PRIME

l

O

ON

l

O

4

5

6

OFF

(a)

(b)