beautypg.com

Outback Power Systems GVFX Series Inverter/Charger Programing Manual User Manual

Page 47

background image

45

3P CLASSIC B

• Make sure the two slave inverters are in Ports 02 and 03 of the HUB. The inverter on HUB Port 2 is

considered phase B. The inverter on HUB Port 3 is considered phase C.

ADV/FX/STACK----------P01

stack

Master

phase

DOWN INC DEC PORT

• From the Master screen, press the soft key

until P02 appears.

ADV/FX/STACK-----------P02

stack

Master

phase

DOWN INC DEC PORT

• Each new Port screen in the stacking menu will

open with Master displayed. To change the stacking
designation, press the soft key until 3p Classic
B appears.

ADV/FX/STACK----------P02

stack 3p Classic B

phase

DOWN INC DEC PORT

• After establishing P02 as a 3p Classic B, press the

soft key to switch to P03.

ADV/FX/STACK----------P03

stack

Master

phase

DOWN INC DEC PORT

• As before, P03 will open with Master displayed.

Press the soft key until 3p Classic C appears.

ADV/FX/STACK----------P03

stack 3p Classic C

phase

DOWN INC DEC PORT

• Press the Press the soft key when finished.

This will allow you to observe the power save levels,
or exit the menu.

This manual is related to the following products: