beautypg.com

Outback Power Systems GVFX Series Inverter/Charger Programing Manual User Manual

Page 40

background image

38

3. After powering up the components, connect the MATE to the HUB.

a) Plug the MATE into the 1st MATE Port on the HUB.
b) The MATE will power up and should recognize any component connected to the HUB.
c) The MATE can then program the FXs.
d) The fifth MATE screen (“Port Assignment”) should display all the FXs and any OutBack Charge Controllers in

the system.

MATE Screens

PATH

g’day mate (C) 2008

version

Searching

Port Assignment

OutBack

Code a.aa

for Devices

1> FX 2> FX 3> CC 4> CC

Power

5> 6> 7> 8>

Systems

Serial #xxxxxxxx

HuB Found

9> 10> 2m>

Screen EE b.bb

4. To verify the MATE recognizes each HUB connected FX and OutBack Charge Controller, disconnect and then
either (a) reconnect the MATE to view its boot-up and repoll sequence or (b) follow this path to manually repoll:

PATH

mAIN-------------------

SETuP-----------------

SETuP/mATE/PAgE1

SETuP/mATE/PAgE2

SETuP/mATE/COmm

12.15:30p

mate code rev: 4.1.6

choose category:

choose category:

choose device:

choose category:

Sum STATuS SETuP ADv

FX mATE

CLOCk CNT gLOw Pg2

Pg1 Sumry COmm mAIN

BACk rEPOLL PC DEBug

The FXs are now ready to be programmed according to the stacking options described in the next
section.

This manual is related to the following products: