beautypg.com

Extang Tool Box Tonneaus: FullTilt Tool Box Tonneau User Manual

Installation sheet

background image

PARTS INCLUDED IN YOUR KIT. You may want to lay them out in this manner for accessibility.

Register your warranty

extang.com

I t e m N o . 0 1 3 9 - 1 4 0 1 R H P r i n t e d i n U . S . A .

INSTALLATION SHEET

Remove and discard paper tape.

Foam has NO adhesive to

touch truck finish.

Wash truck bed and toolbox in place.

P L E A S E

D O N O T

L I T T E R

Insert “L” bars into the channel in

the lower hinge rail.

Do not tighten.

Spring Bows

(x2-Short Bed)

(x3-Long Bed)

Side Rails

(L and R)

Corner Braces

(x4)

Tailgate

Rail

Lower

Hinge Rail

Gas Struts (x2)

MISSING PARTS???

Call Extang at

1-800-877-2588

Any and all needed parts will be shipped to you directly.

(DO NOT return whole kit to store)

“L” Bars

(L and R)

with clamps

included

Extang Corporation

5400 S. State Rd.

Ann Arbor MI 48108

734-677-0444, Fax: 734-677-8409

Upper Hinge Rail

Assembly w/Tarp attached

Allen Wrenchs

(3 sizes)

“L” Channel

w/Seal

Position L channel against rear face

of toolbox, centered left and right

1

2

3

4

0662