SETTING THE APRON AND PUSHOFF VALVE
The manifold block containing the pushoff sequence valve cartridge and apron sequence valve
cartridge is used to control two hydraulic circuits with one hydraulic remote. when the tractor hydraulic
remote is activated, oil flows first to the apron cylinders until they are fully extended. Once the cylin-
ders are fully extended, the apron circuits’ hydraulic pressure begins to increase. Once the pressure
threshold is surpassed (which is adjustable. See adjustment section), the sequence valve diverts the
oil flow to the pushoff’s hydraulic circuit. Once the push off is completely extended the operator then
reverses the tractors hydraulic remote. The counterbalance valve will hold the apron open until the
push off is fully retracted. The Apron sequence valve then opens and allows the apron to close.
Setting the valves:
STEP 1 PUSHOFF SEQUENCE VALVE
Loosen the lock nut (3/4”) on the sequence valve cartridge. Turn the setscrew (1/4”) clockwise
until the front apron rises before the push-off begins to advance. (Earthmover should be empty) Turn
the adjustment screw an additional 1/4 turn clockwise and tighten jam nut.
STEP 2 APRON SEQUENCE VALVE
Loosen the lock nut (3/4”) on the counterbalance valve cartridge. Turn the setscrew (1/4”)
clockwise until the apron holds in a raised position while rear gate is being retracted. Turn adjustment
screw an additional 1/4 turn, tighten jam nut. DO NOT tighten adjusting screw more than necessary.