beautypg.com

APC AP9268 User Manual

Page 13

background image

APC KVM Switch Installer/User Guide

8

12. Power-up your APC KVM Switch unit fi rst, then power up all attached

computers.

13. If your remote user location utilizes Sun peripherals you will need to

set the APC KVM Switch to recognize them before they can be used.

To do this:

a. Activate the on-screen display (OSD) by pressing either of the keyboard

Control keys twice within one second.

b. Press the Control keys twice more to access Administrator Commands.

c. Use your arrow keys to highlight “Administrator Functions” and

press Enter.

d. Highlight and select the “Remote User” menu selection. Use the space

bar to cycle through peripheral types and select the ones appropriate
to your system. Press Enter to select.

The APC KVM Switch and all attached computers should be powered-

down before servicing the unit. Always disconnect the power cord from
the wall outlet.

11. Locate the proper power cord and plug it into the IEC power connector on

the APC KVM Switch. Make sure that the power switch is off, then plug the
other end of the power cord into an appropriate AC wall outlet. This outlet
must be near the equipment and easily accessible to allow for unplugging
prior to any servicing of the unit.