beautypg.com

Ipcp down, Ipcp up, Ipxcp down – ADTRAN Express 4120 User Manual

Page 153: Ipxcp up, Lcp down, Lcp up, Link is looped back

background image

Appendix B. Log Messages

61200176L3-1

Express 4110/4120 User Manual

B-3

IPCP down

level 5

IP Control Protocol port has been dropped between Express 4110/
4120 and PPP peer.

IPCP up

level 5

IP Control Protocol port has been successfully negotiated between
Express 4110/4120 and PPP peer.

IPXCP down

level 5

IPX Control Protocol port has been dropped between Express 4110/
4120 and PPP peer.

IPXCP up

level 5

IPX Control Protocol port has been successfully negotiated between
Express 4110/4120 and PPP peer.

LCP down

level 5

Link Control Protocol port has been dropped between Express 4110/
4120 and PPP peer.

LCP up

level 5

Link Control Protocol port has been successfully negotiated between
Express 4110/4120 and PPP peer.

Link is looped back

level 3

The Express 4110/4120 has dialed a location which is looping back all
data. Essentially, it has negotiated PPP with itself.

This manual is related to the following products: