Installing hardware options, Installing the server into the rack – HP ProLiant DL385 G6 Server User Manual
Page 32
Setup 32
Installing hardware options
Install any hardware options before initializing the server. For options installation information, refer to the
option documentation. For server-specific information, refer to "Hardware options installation (on page
Installing the server into the rack
CAUTION:
Always plan the rack installation so that the heaviest item is on the bottom of the
rack. Install the heaviest item first, and continue to populate the rack from the bottom to the top.
1.
Install the server and cable management arm into the rack. For more information, see the installation
instructions that ship with the 2U Quick Deploy Rail System.
2.
Connect peripheral devices to the server.
Item Description
Color
1
PCI slot 5
—
2
PCI slot 6
—
3
PCI slot 4
—
4
PCI slot 2
—
5
PCI slot 3
—
6
PCI slot 1
—
7
Power supply 2
—
8
Power supply 2 connector
—
9
Power supply 1
—
10
Power supply 1 connector
—
11
USB connectors (2)
Black
12 Video
connector
Blue
13
NIC 1 connector
—
14
NIC 2 connector
—
15 Mouse
connector
Green
16 Keyboard
connector
Purple
17 Serial
connector
—