Install the access panel, Remove the pci riser cage – HP ProLiant DL385 G6 Server User Manual
Page 22
Operations 22
1.
Power down the server if performing a non-hot-plug installation or maintenance procedure ("
2.
Extend the server from the rack (on page
3.
Use the T-15 Torx screwdriver attached to the rear of the server to loosen the security screw on the
hood latch.
4.
Lift up on the hood latch handle, and then remove the access panel.
Install the access panel
1.
Place the access panel on top of the server with the hood latch open. Allow the panel to extend past
the rear of the server approximately 1.25 cm (0.5 in).
2.
Push down on the hood latch. The access panel slides to a closed position.
3.
Use the T-15 Torx screwdriver attached to the rear of the server to tighten the security screw on the
hood latch.
Remove the PCI riser cage
CAUTION:
For proper cooling do not operate the server without the access panel, baffles,
expansion slot covers, or blanks installed. If the server supports hot-plug components, minimize
the amount of time the access panel is open.
1.
Power down the server (on page
2.
Extend the server from the rack (on page
3.
Remove the access panel (on page
4.
Remove the PCI riser cage.