Hardware options installation 82

9.

Install the capacitor pack.

10.

Install the large redundant air baffle, if removed.

11.

Install the access panel.

12.

Do one of the following:

o

Close or install the tower bezel, as needed.

o

Slide the server back into the rack.

13.

Power up the server (on page

24

).

150W PCIe video/graphics controller power cable
option

To determine power requirements for supported options, use the power calculator located at the HP website

(

http://www.hp.com/servers/powercalculator

).

Before installing a high-wattage video/graphics controller, install the cable. For more information, see
"Installing an expansion board (on page

71

)."

CAUTION:

To avoid damage to the pin connectors, only use the supported video cable when

installing this option. For supported options, see the QuickSpecs at the HP website

(

http://www.hp.com/servers/proliantml350

).

To install the component:

1.

Power down the server (on page

24

).

2.

Do one of the following:

o

Open or remove the tower bezel, as needed ("

Open or remove the tower bezel

" on page

25

).

o

Extend the server from the rack (on page

24

).

3.

Remove the access panel (on page

26

).

4.

Disconnect all cables connected to the system board ("

System board components

" on page

11

).