beautypg.com

HP ProLiant ML350 G6 Server User Manual

Page 64

background image

Hardware options installation 64

o

Full-height device

7.

Connect the data and power cables to the rear of the device.

8.

Slide the drive into the bay until it clicks.

9.

When shipping a server with a full-height device installed, replace the front guide screw with a shipping
screw ("

Installing the full-height media device shipping screw

" on page

64

).

10.

Install the access panel (on page

27

).

11.

Do one of the following:

o

Close or install the tower bezel, as needed.

o

Slide the server back into the rack.

Installing the full-height media device shipping screw

When shipping a server with a full-height media device installed, always install a shipping screw to secure

the device.

1.

Install the full-height media device ("

Installing a half-height or full-height media device

" on page

63

).

2.

Remove the front guide screw from the full-height media device.