beautypg.com

Installing hardware options, Setting up a tower server – HP ProLiant ML350 G6 Server User Manual

Page 34

background image

Setup 34

Rack-mounting hardware

In addition to the supplied items, you may need:

T-15 Torx screwdriver

Hardware options

Operating system or application software

PDU

Installing hardware options

Install any hardware options before initializing the server. For options installation information, refer to the
option documentation. For server-specific information, refer to "Hardware options installation (on page

37

)."

Setting up a tower server

Follow the steps in this section to set up a tower model server. If you are going to install the server into a rack,

refer to the rack installation ("

Installing the server into the rack

" on page

35

) section.

1.

Install the feet.

2.

Return the server to an upright position.

3.

Connect peripheral devices to the server ("

Rear panel components

" on page

9

).

WARNING:

To reduce the risk of electric shock, fire, or damage to the equipment, do not plug

telephone or telecommunications connectors into RJ-45 connectors.

4.

Connect the power cord to the rear of the server.

5.

Connect the power cord to the AC power source.