Operations, Powering up the system, Power down the node – HP ProLiant SL4540 Gen8 Server User Manual
Page 21: Remove a node from the chassis
Operations 21
Operations
Powering up the system
1.
Connect the power cables to the power supplies.
2.
Connect the power cables to the power source (UPS or wall outlet) or to an installed PDU.
3.
Press the Power On/Standby button on the node.
Power down the node
Before powering down the node for any upgrade or maintenance procedures, perform a backup of critical
server data and programs.
IMPORTANT:
When the node is in standby mode, auxiliary power is still being provided to the
system.
To power down the node, use one of the following methods:
•
Press and release the Power On/Standby button.
This method initiates a controlled shutdown of applications and the OS before the node enters standby
mode.
•
Press and hold the Power On/Standby button for more than 4 seconds to force the node to enter
standby mode.
This method forces the node to enter standby mode without properly exiting applications and the OS.
If an application stops responding, you can use this method to force a shutdown.
•
Use a virtual power button selection through iLO.
This method initiates a controlled remote shutdown of applications and the OS before the node enters
standby mode.
Before proceeding, verify the node is in standby mode by observing that the system power LED is amber.
Remove a node from the chassis
1.
CAUTION:
To avoid damage to the node, always support the bottom of the node when removing
it from the chassis.
2.
Remove the node from the chassis:
a.
Press the release button.
b.
Lower the handle.