beautypg.com

Installing hardware options – HP ProLiant SL390s G7 Server User Manual

Page 20

background image

Setup 20

WARNING:

To reduce the risk of personal injury or damage to the equipment, be sure that:

The leveling jacks are extended to the floor.

The full weight of the rack rests on the leveling jacks.

The stabilizing feet are attached to the rack if it is a single-rack installation.

The racks are coupled together in multiple-rack installations.

Only one component is extended at a time. A rack may become unstable if more than one

component is extended for any reason.

WARNING:

To reduce the risk of personal injury or equipment damage when unloading a rack:

At least two people are needed to safely unload the rack from the pallet. An empty 42U rack
can weigh as much as 115 kg (253 lb), can stand more than 2.1 m (7 ft) tall, and might

become unstable when being moved on its casters.

Never stand in front of the rack when it is rolling down the ramp from the pallet. Always handle
the rack from both sides.

Identifying the contents of the server shipping carton

Unpack the server shipping carton and locate the materials and documentation necessary for installing the
server. All the rack mounting hardware necessary for installing the server into the rack is included with the

rack or the server.
The contents of the server shipping carton include:

Server

Power cord

Hardware documentation, Documentation CD, and software products

Rack-mounting hardware

In addition to the supplied items, you might need:

Operating system or application software

Hardware options

Installing hardware options

Install any hardware options before initializing the server. For options installation information, refer to the

option documentation. For server-specific information, refer to "Hardware options installation (on page

24

)."