Operations, Power up the server blade, Operations 17 – HP ProLiant BL25p Server-Blade User Manual
Page 17
17
Operations
In This Section
Power Up the Server Blade ..........................................................................................................
Power Down the Server Blade......................................................................................................
Remove the Server Blade .............................................................................................................
Power Up the Server Blade
By default, the server blade is set to power up automatically when installed in the
server blade enclosure. Be sure the server blade is compatible with the server
blade enclosure. Refer to "Server Blade Enclosure Compatibility (on page
If the default setting is changed, use one of the following methods to power up
the server blade:
•
Power On/Standby button
−
A momentary press initiates a power-up request. The server blade
determines power availability from the power subsystem. If required
power is available, the server blade powers up.
−
A press of 5 seconds or more initiates a power-up override. The server
blade powers up without power availability detection from the system.
CAUTION: Always observe iLO alerts before initiating a
power-up override to prevent a hot-plug power supply fault and possible
loss of system power. For more information, refer to the HP Integrated
Lights-Out User Guide.
NOTE: You can perform a server blade power-up override when the
management modules are not in use to manage the power-up request.
Be sure that sufficient power is available.
•
Virtual power button features through iLO
−
A momentary power-up selection
−
A hold power-up selection