Takagi T-M32 User Manual
Page 13

- 13 -
Horizontal Installation Diagram
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Vertical Installation Diagram
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
• Regarding the clearance from the terminator to the air inlet or opening, refer to the next
page.
• Install a condensation drain in the venting. 
• Follow the vent system to vent manufacturer’s instruction and local code. 
• Do not common vent or connect any vent from other appliances to the T-M32 vent. 
• Use 4” category III approved or Special BH, single or double wall stainless steel vent 
pipe.
Wall
Roof
Rain Cap
Roof Flashing
Sidewall Vent 
Terminator 
Vertical Condensation Drain 
(Install according to local codes) 
TK-BF01 Backflow preventor 
(Recommended for freezing 
weather conditions: 36°F and 
below) 
TK-BF01 Backflow preventor 
(Recommended for freezing 
weather conditions: 36°F and 
below) 
Vertical Condensation Drain 
(Install according to local codes) 
