beautypg.com

0 electrical installation, 0 optional 3-valve manifold procedure – Setra System Model 231 User Manual

Page 6

background image

6

3-Valve Manifold Description

Manifold Block

Brass

Valves (3)

V1 for connection to + port
V2 for connection to - port
V3 for equalizing pressure

Valve Type

90 degree On/Off

Process Connections

1/4-18NPT Internal Thread

Model 231
Differential
Pressure Transducer

Shunt Valve

V1

V2

V3

Shut Off Valves

High Process
Connection
1/8-NPT

Low Process
Connection
1/8-NPT

3.0 OPTIONAL 3-VALVE MANIFOLD PROCEDURE

The 3-Valve Manifold Assembly is normally shipped with valves V1 and V2 closed
and V3 open.

To Place the 231 into service:
1. Confirm valves V1 and V2 are closed and valve V3 is open.
2. Mount the manifold and install process connections.
3. Slowly open V2, then V1.
4. Close the V3 valve.

To Take the 231 out of Service
1. Open V3 to equalize the pressure at the Model 231.
2. Close the V1 and V2 valves.