Verification device tests, Main test – Badger Meter M-Series Field Verification Device User Manual
Page 16
Page 16
8-11
Field Verification Device
Verification Device Tests
Main Test
The main test is the standard process for meter testing. The result of this test is automatically stored in the memory of the
Veriification Device and can be downloaded to the PC program.
Peform the following steps:
1. Switch off the flow meter and connect the specific wire harness to the amplifier circuit board
2. Connect the male D-25 connector of the harness to the corresponding female connector on the Verification Device.
3. Switch on the flowmeter to be sure that the meter is not in the programming mode when the test is started.
4. Press the On/Off button on the Device and wait for the SelfTest to complete.
5. When the Start Menu appears in the display, press the upper left function key.
6. When the Main Test option is highlighted, press the OK button.
7. Press the appropriate numbers on the numeric keypad for the Test ID and press OK. The Test ID is a value which can
be used as a customer tag.
8. Select Dry or Wet based on the inside condition of the detector tube. This selection has influence on the test results
of the electrode measurement.