Spectrex 20/20MU - Mini Flame Detector User Manual
Page 31
Spectrex Inc. - SharpEye
TM
ML & MU Flame Detector Manual – TM 767100, Rev. A, April 2005
23
6.3 Preparation for Installation
Installation should comply with local codes or NFPA as applicable to flame
detectors. The detectors can be installed with the use of general-purpose common
tools and equipment.
1 Verify the appropriate Purchase Order. Record the Part No. and the Serial No.
of the detectors and the installation date in the appropriate Log-book.
2 Open the container package prior to detector installation and visually inspect
the detector.
3 Verify that all components required for the detector installation are readily
available before commencing the installation. In case that the installation is
not completed in a single session, secure and seal detectors and conduits.
4 For wiring, use color-coded conductors or suitable wire markings or labels.
12 to 20 AWG (0.5 mm² to 3.5 mm²) wires may be used for site wiring. The
selection of wire gauge should be based on the number of detectors used on
the same line and the distance from the control unit, in compliance with
specifications.