beautypg.com

GW Instek GOM-801H User Manual

GW Instek Equipment

background image

Declaration of Conformity

We

GOOD WILL INSTRUMENT CO., LTD.

No. 7-1, Jhongsing Rd, Tucheng City, Taipei County 236, Taiwan

GOOD WILL INSTRUMENT (SUZHOU) CO., LTD.

No.69 Lushan Road, Suzhou New District Jiangsu, China.

declares that the below mentioned product

GOM-801H

are herewith confirmed to comply with the requirements set out in the Council Directive on
the Approximation of the Law of Member States relating to Electromagnetic Compatibility
(89/336/EEC, 92/31/EEC, 93/68/EEC) and Low Voltage Equipment Directive
(73/23/EEC, 93/68/EEC).
For the evaluation regarding the Electromagnetic Compatibility and Low Voltage
Equipment Directive, the following standards were applied:

◎ EMC

EN 61326-1:

Electrical equipment for measurement, control and laboratory use –– EMC

requirements (1997+A1: 1998 +A2:2001+A3:2003)

Conducted and Radiated Emission
EN 55011: 1998+A1:1999 + A2:2002
Group I class B

Electrostatic Discharge
IEC 61000-4-2: 2001

Current Harmonic
IEC 61000-3-2: 2000

Radiated Immunity
IEC 61000-4-3: 2002+A1:2002

Voltage Fluctuation
IEC 61000-3-3: 1995+A1:2001

Electrical Fast Transients
IEC 61000-4-4: 1995+A1:2001+A2:2001

-------------------------

Surge Immunity
IEC 61000-4-5: 2001

-------------------------

Conducted Susceptibility
IEC 61000-4-6: 2001

-------------------------

Power Frequency Magnetic Field
IEC 61000-4-8: 2001

-------------------------

Voltage Dips/ Interrupts
IEC 61000-4-11: 2004

Safety

Low Voltage Equipment Directive 73/23/EEC & amended by 93/68/EEC

IEC / EN 61010-1: 2001

GOM-801H DC MILLI-OHM METER

USER MANUAL

⎯ ⎯

i

CONTENTS

PAGE

1. PRODUCT INTRODUCTION ............................................................1

2. SPECIFICATIONS ...............................................................................2

3. PRECAUTIONS BEFORE OPERATION .........................................4

3-1.

U

NPACKING THE

I

NSTRUMENT

..........................................................4

3-2.

L

INE

V

OLTAGE

..................................................................................4

4. PANEL INTRODUCTION...................................................................5

5. CIRCUIT DESCRIPTION ...................................................................7

6. OPERATION INTRODUCTION

.................................................9

6-1.

P

RELIMINARY

O

PERATION

.................................................................9

6-2.

M

EASUREMENT OF

R

ESISTOR

............................................................9

6-3.

M

EASUREMENT OF

S

WITCH

.............................................................10

7. MAINTENANCE.................................................................................11

7-1.

L

INE FUSE REPLACEMENT

................................................................11

7-2.

C

LEANING

........................................................................................11