Note: Memory deletion and restoring defaults are both irreversible.

EXIT:

This menu option returns the meter to MAIN MENU.

IR LINK:

This menu option initiates a wireless communication session during which the currently stored

readings will be downloaded to a PC. Before using this feature, the target PC must be loaded with

Delmhorst’s Universal Application Program and a Delmhorst base unit must be connected to an

available USB port.

REQUIREMENTS:

The wireless communication technology employed in the meter requires line-of-sight access

between the red side window of the meter and the receiving window of the base unit. Simply

place the meter and base unit on a flat surface, with the red side window of the meter facing the

receiving window of the base unit. Separation requirements between the meter and base unit are

anywhere from 0 to 12 inches.

OPERATION:

1. Begin by starting the Delmhorst Instrument Co. Universal Application Program (double

click the application icon or choose the program from the Start Menu).

2. Once the Navigator and base unit are lined up and the base unit is connected to a USB

port (a green LED should be lit), select the IR LINK option in the Main Menu. The meter will

display the message “Linking…” for a few seconds, followed by “Link OK” when successful

communication is established with the base unit. The base unit will also indicate

communication established by turning off the green LED and turning on a red LED.

3. Press the “MANAGE DATA” button in the Delmhorst Instrument Co. Universal

Application Program. The meter will display “Data” on the screen and the base unit will

alternately turn on a yellow and red LED while data transfer takes place (red indicates

communication between the meter and Base Unit, while yellow indicates communication

between the base unit and the PC). When finished, the meter will return to the Main Menu

and the base unit will, once again, turn on its green LED. For further details on managing the

meter data in the PC please refer to the HELP feature in the program.

NOTE: The above sequence of events in initiating communication between the PC and the

meter is not mandatory. The Application Program may be started first, or the IR Link may be

selected first. The MANAGE DATA button may also be pressed before communication is

started between the Base Unit and the meter. The meter, base unit and Application Program