Hired-Hand Mega-Cool: Mega-Cool Pad Extender Kit User Manual
Page 3
Hired-Hand Mfg., Inc. • 1733 Co Rd 68 • Bremen, Alabama 35033 • Phone 256-287-1000 • Fax 256-287-2000
Sheet Part No. 4801-5136 Rev. 12-04
Page 3 of 5
STEP 3
Mount the top of the
Extender Brackets 3. 5" (8.9 cm)
below the bottom of the Opening
and on 5ft (1.52 m) centers as
shown.
5'
STEP 4
At this point refer to the Mega-
Cool Manual for instructions to install the 8”
PVC pipe. Follow the Mega-Cool manual
until after the PVC end caps have been
installed on the 8” pipe. Then return to Step 5
of these instructions.
STEP 5
After the 8” pipe is
mounted, install the Flashing. NOTE:
The lower lip of the flashing rests on the
top of the 8” pipe.
MOUNTING SCREWS
Material Part
Number
Description
WOOD
1004-1386
SCREW SM 10-12 X 1” hx z
METAL
1004-0050
SCREW SM #14 x 1”hx tek z
0404-4655
Side View
3.5" (8.9 cm)
Side View
Opening
Size from
Table
“A”
plus 3.5”
(6.35 cm).
STEP 6
Select the mounting hardware for the Top Extender
Bracket from the table below. See Step 7 for the vertical
placement of the Top Extender Bracket.
MOUNTING SCREWS – Top Extender
Material Part
Number
Description
WOOD
1004-7017
SCREW CAP 3/8”-#16 X 5” hx z
METAL
1004-0050
SCREW SM #14 X 1” hx tek z
0404-4657
Side View