Stuart Turner Monsoon Extra S3.0 bar Single User Manual
Page 18

- 18 -
GOOD PRACTICE
Always flush system prior to installing a new or serviced pump.
Always ensure the pump is primed (filled with water) before starting.
DO NOT RUN
PUMP DRY.
Always ensure the pump has a minimum flooded suction head of 1 metre at all times.
Always ensure anti-vibration feet are used.
Ensure pump is sited in dry ventilated position.
Do not allow pump to freeze.
Abide by the Water Supply (Water Fittings) Regulations 1999.
Always install isolating gate valve to both suction and delivery pipework.
Ensure earth continuity between suction and delivery pipes.
Always ensure pump wiring conforms with the current national electrical regulations and
is installed by a competent person.
Do not install a non-return valve, or devices which
contain non-return valves, in the suction (inlet) pipework
to the pump. The pump must be free to vent to the
supply tanks at all times.
Disconnect electrical supply before working on pump or motor.
Carefully check pump and pipework for leaks before leaving the installation unattended.
Cont ...