Figure 11 - Manufacturer’s Recommended Service Clearances
Note: Recommended ceiling clearance 36" 
(914mm) is to the top of the furnace venting 
collar assembly.
VENTING†
All venting installations shall be in accordance with the 
latest edition of Part 7, “Venting of Equipment”, of the 
National Fuel Gas Code, ANSI Z223.1 or applicable 
provisions of local building codes.
CARBON MONOXIDE! Your venting
system must not be blocked by any snow, snow 
drifts or any foreign matter. Inspect your venting 
system to ensure adequate ventilation exists at all 
times! Failure to heed these warnings could result 
in Carbon Monoxide Poisoning (symptoms include 
grogginess, lethargy, inappropriate tiredness, or fl u-
like symptoms).
The venting is an integral part of
the unit and must not be altered in the fi eld.
†Refer to the Separated Combustion Indoor Duct 
Furnace Manual for more venting requirements.
Ductwork
Field
AIR FLOW
D6573
Inlet
Air
Ductwork
Field
AIR FLOW
Ductwork
Supply
Supply
Ductwork
18(457mm)
(635mm)
18(457mm)
5/16
5/16
(8mm)
(8mm)
25
17.5 (444mm)
5/16
(8mm)
(8mm)
5/16
18 (457mm)
(8mm)
5/16
(8mm)
5/16
18 (457mm)
(8mm)
5/16
(8mm)
5/16
36 (914mm)
Vent Systems
Termination Clearance Requirements
Structure/Object
Minimum Clearance
for Termination Locations
USA
CANADA
Door, window, or gravity vent 
inlet; combustion air inlet for 
other appliances
9 inch for 10,000 to 
50,000 BTU/Hr 
input; 12 inch for 
input exceeding 
50,000 BTU/Hr.
9 inch (230mm) for 
10,000 to 50,000 
BTU/Hr input; 
12 inch (305mm) 
for input exceeding 
50,000 BTU/Hr.
Forced air inlet within 10 feet
3 feet above
6 feet (1.8m)
Adjoining Building or parapet
6 feet
6 feet (1.8m)
Adjacent public walkways
7 feet above 
grade
7 feet (2.1m) above 
grade
Electric, gas meters 
& regulators
4 feet horizontal
3 feet (0.9m) 
horizontally from 
meter/regulator 
asembly. 6 feet 
(1.8m), any 
direction, from 
a gas service 
regulator vent outlet
Above grade level*
1 foot*
1 foot (0.3m)*
*If the vent terminal is to be installed near ground level, the vent 
terminal must be positioned at least six inches (152mm) above the 
maximum anticipated snow depth. 